Sunday, November 4, 2012

SHOP WORK

 Started the fab work on Verns Yamy Triple Saturday. Had to stretch the rear tank mount to work with his stock mount.
 Chuck is starting to cut the frame work for the seat section.
 Under the helmet welding the steel together.
 This is what we came up with, it uses the stock hindges and latch and release spring all cut up to work with the framework we came up with.



Works really well, it is strong as hell and is pleasing to the eye. It is a little tight in my little shop for Vern, Chuck, and I but we seem to get a lot of work done, and have a good time doing it. Thats what it is all about. Next on to mounting the battery and tail light under the bump stop. Got the tires mounted on the wheels for the Gold Wing today, took me Less then 20 minutes to get them done. I dont need no stinking tire machine.

No comments:

Post a Comment