Sunday, February 24, 2013

SHOP WORK




 We got the rear sub frame fabbed up for Stevens CB750 project. Steven had some arcgs bent up with 1 1/8 DOM tubingand went over to a buddy's and bent the tight bend for the very back of the frame. Progress is moving right along, starting on oil tank and seat, and mounting the gas tank next Saturday.

We also got the forks rebuilt and everything painted up and put back on the bike, and also rebuilt the water pump and installed the new timing belts.

1 comment:

  1. Looks good Tony, I can't thank you enough for the work you have helped me with on the cb750.

    ReplyDelete